Installing The Cable Management Brackets - Nortel Passport 8000 Series Installing And Maintaining

Hide thumbs Also See for Passport 8000 Series:
Table of Contents

Advertisement

8
Lift the 8010co chassis onto the installation shelf.
Warning: It requires three people to lift the 8010co chassis. You must
remove the interface modules and power supplies before lifting
9
Holding the 8010co chassis in position, align the flanged end of the chassis
mounting rail with six holes on each side of the vertical rack support.
10 Make sure that the hole pairs on either side of the vertical support match
horizontally.
11 Tighten each clipnut screw with a Phillips screwdriver.
Note: After the 8010co chassis is secured in the rack, you can remove
the installation shelf.

Installing the cable management brackets

The cable management brackets keep groups of cables fastened and out of the
way, but accessible for maintenance.
To install the top cable management bracket:
1
Align the mounting retainers on the inside of the top cable management
bracket with the holes on the front of the chassis
2
Push the sides of the top cable management bracket in place.
3
Insert and tighten the 8 screws using a Phillips screwdriver to secure the top
cable management bracket to the chassis
To install the two side cable management brackets:
1
Align the slots on the side bracket with the rods in the chassis
page
68).
2
Push the bracket into place.
Chapter 3 Installing the 8010co chassis 67
Installing and Maintaining the Passport 8000 Series Chassis
(Figure 35 on page
(Figure 35 on page
68).
68).
(Figure 35 on

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Passport 8010Passport 8006Passport 8003

Table of Contents