Avaya 8800 Commissioning Manual page 50

Ethernet routing switch
Table of Contents

Advertisement

Initial steps using the ACLI
Figure 8: Initial commissioning procedures
Initial commissioning navigation
Job aid
Connecting a terminal
Connecting a modem
Configuring the switch with the setup utility
Configuring system identification
Configuring the time zone
Configuring the date
50
Commissioning
on page 51
on page 52
on page 53
on page 65
on page 67
on page 60
on page 63
June 2011

Advertisement

Table of Contents
loading

This manual is also suitable for:

8600

Table of Contents