Appendix B - Water Level Probe Info - FULTON J Series Installation, Operation And Maintenance Manual

Gas fired steam boiler (including optional fully modulating burner)
Table of Contents

Advertisement

Fulton Ltd
Only Angle Rajah are to be used to connect wire to the probes.
The Terminal & Securing Nuts are tightened to a specified torque during manufacture which
causes the PTFE Insulation to seal against the probe body. Therefore these nuts must not be
adjusted because the seal will be broken which may cause the probe to leak (see Figure. 34).
Angle Rajah ONLY must be used to connect wire to the probes because they clip directly to the
Terminal Nut. Spade Connectors must NOT be used because the Terminal Nut would require
adjustment and therefore cause the probe to leak (see Figure. 35).
N.B. The Probe Rod Grub Screw and Lock Nut are suitably tightened during manufacture,
meaning the probe is ready to be installed without any adjustment.
The ONLY instance a spanner should be used, is to turn the Probe Body in order to remove or
reinstall the entire probe.
Terminal nut
Probe body
PTFE
Insulation
Probe rod
Figure. 34 - Water Level Probe Components
JGASUK-IOMM-2015-2
!
IMPORTANT
Terminal and securing nuts must not be adjusted.
Securing nuts
Probe rod
grub screw
Probe rod
lock nut
APPENDIX B - WATER
LEVEL PROBE INFO
Angle rajah
Terminal nut
Probe body
Figure. 35 - Angle Rajah Fitted to Probe
APPENDIX - B
Probe wire
Page 55