Switching The Multi-Node Server System On And Off - Fujitsu PRIMERGY CX420 S1 Operating Manual

Dual node cluster server
Hide thumbs Also See for PRIMERGY CX420 S1:
Table of Contents

Advertisement

6.2
Switching the multi-node server system on
and off
The multi-node server system consists of up to four server nodes. Each server
node installed in the Dual Node Cluster Server works independently.
To switch on the multi-node server system the power cord must be connected
to the mains and each server node must be switched on separately.
I
The controls and indicators are shown in figure
V
CAUTION!
It nothing appears on the screen but flickering stripes after switching
on the server node, switch the server node off immediately (see
chapter
The On/Off button does not disconnect the server node from the
mains voltage. To completely disconnect it from the mains voltage,
remove the power plug(s) from the socket(s).
Do not move, strike, or shake the multi-node server system when it is
turned on. This can damage the hard disk in the Dual Node Cluster
Server and cause data loss.
Turn the multi-node server system on when the temperature is in its
operating environment range (5°C ~ 35°C). For details on the
operating environment, refer to "Safety Precautions". When
operating the device outside of this operating environment, the multi-
node server system may operate improperly, damage data etc.
Furthermore, Fujitsu cannot be held responsible for any related
damage, malfunction, or loss of data, etc.
Be sure to wait for 10 seconds or more after shutdown before turning
the server node on.
After connecting the power cord, press the On/Off button after it
passes for more than 10 seconds.
CX420 S1
"Troubleshooting and tips" on page
Operating Manual
Starting up and operation
7 on page
45.