Fujitsu PRIMERGY CX420 S1 Operating Manual page 17

Dual node cluster server
Hide thumbs Also See for PRIMERGY CX420 S1:
Table of Contents

Advertisement

Mounting order
Figure 1: Mounting order
Item
Bay
1
Installation bay 1 for server node CX272 S1
2
Installation bay 2 for server node CX272 S1
3
Installation bay 1 for PSU
4
Installation bay 2 for PSU
Table 1: Mounting order of server nodes
Each CX420 S1 has to be populated with 2 CX272 S1 server nodes.
All nodes are hot pluggable, and all nodes are of the same type. Each node has
to have the identical configuration.
For the minimum configuration two PSUs have to be installed.
CX420 S1
Operating Manual
Functional overview
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents