1. Place at least one operator/pipe loader in the bursting pit. Keep this person at rear of unit in operating
area (page 6).
2. Start power unit engine. Set engine to high throttle.
NOTICE: To shut down power unit when using remote controller, press the remote stop switch
on remote controller. If not using remote controller, turn engine off at the power unit.
3. Turn mode selector switch on remote controller to pullback mode.
4. Lock bungee. See "Lock Bungee" on page 53.
5. Open clamp.
6. Pull rod into bursting unit until first joint is
visible in window (shown).
7. Close clamp.
8. Move carriage back until rod lines up with
end of skis (shown).
9. To disconnect rods rotate spinner control
counterclockwise.
NOTICE: After first rod has been
removed, carriage can be moved back
while spinner is rotated to disconnect
rods.
10. Remove rod.
11. Open clamp.
12. Move carriage to front of machine.
13. Close clamp.
14. Move carriage to back of machine.
15. Open clamp.
16. Move carriage to front of machine.
17. Repeat steps 7-16 to complete job.
Pull Back Rods
Burst Pipe - 59