Hammerhead 100XT Operator's Manual page 41

Table of Contents

Advertisement

100XT Operator's Manual
Prepare Jobsite
Requirements
Installation Pit (1)
Pit dimensions depend on pipe depth and product being installed.
Must be in line with existing pipe.
Sloped back end aids new product installation. Consider new product bend radius.
Bursting Pit (2)
Must be level to align bursting unit properly with existing pipe.
Cover pit floor with gravel for drainage and to allow bursting unit to be level with existing pipe.
Bottom 34" of pit wall must be square (90°) with pit floor.
NOTICE: Loose soil may need to be shored to support force of burst.
Place steel road plate underneath bursting unit.
NOTICE: Follow U.S. Department of Labor regulations on excavating and trenching (Part 1926, Subpart
P) and other similar regulations.
To help avoid injury:
Follow local regulations for confined space.
Test the atmosphere in manholes and other confined spaces before entering and continuously while
in the confined space.
Have an emergency plan in place.
40 - Prepare
Entering a confined space without following all required
procedures and having and effective emergency rescue plan can result in
serious injury or death.

Advertisement

Table of Contents
loading

Table of Contents