Siemens Synco 900 Mounting And Commissioning page 3

Hide thumbs Also See for Synco 900:
Table of Contents

Advertisement

We congratulate you ...
... on the selection of the Siemens Synco 900 system and thank you
for purchasing the central apartment unit!
The present document describes how to mount and commission the
central apartment unit and the other system components.
First, please ensure that you become familiar with the operating phi-
losophy of the central apartment unit. Operation itself is covered by
the Operating Instructions (B2707en).
Symbols
The following symbols are used in this document:
The "caution" symbol marks important information that you
must observe to ensure safe operation of plant.
The "info" symbol refers to special information, notes and
practical tips relating to settings and operation of the central
apartment unit and the system.
This symbol refers to disposal notes.
Setting values and predefined values
When commissioning the system, the parameters activated use pre-
defined settings. The document differentiates between guide values
and factory settings.
Guide value:
Factory setting:
Use the boxes provided to enter the settings made when commis-
sioning the plant.
Siemens Switzerland Ltd
Building Technologies Group
International Headquarters
Gubelstrasse 22
CH-6301 Zug
Phone +41 41-724 24 24
Fax +41 41-724 35 22
www.siemens.com/sbt
Siemens
Building Technologies
Recommended setting for the majority of plant.
Setting which can be changed to meet user- or
plant-specific requirements.
Synco 900
© 2006 Siemens Switzerland Ltd
Subject to change
3/88
CE1C2707en
05.07.2007

Advertisement

Table of Contents
loading

Table of Contents