Procedures for installation of the switch
Figure 23: Cascade down stack configuration
Selecting a base unit
This procedure describes the steps to select a base unit.
1. Determine which unit will be the base unit.
2. Locate the Unit Select switch on the rear panel.
3. Slide the switch to the right to designate it as the base unit.
88
Avaya Ethernet Routing Switch 5000 Series Installation
December 2010