Download Print this page

Edelbrock 1584 Installation Instructions Manual page 20

E-force supercharger 2011-2014 ford f-150 5.0l

Advertisement

81. Position the LTR onto the LTR brackets with the inlet
port in the up position as shown. Using a 10mm socket and
six (6) M6 x 10mm bolts from bag #3, loosely secure the
LTR to the LTR brackets. Properly align the LTR and tighten
all bolts including bumper reinforcement bolts and crash
beam nut. Realign the hood latch with the marks made on
Step 79 and tighten bolts.
Inlet Port
M6 x 10mm
82. Using one (1) 3/4" hose clamp from bag #3, secure the
recovery tank to water pump hose to the outlet port on the
recovery tank. Route the hose down and towards the water
pump bracket.
83. Using a razor blade or equivalent, cut a passage hole in
the passenger side radiator shroud. This passage hole
should be around the general area of the water pump
mounting location.
©2017 Edelbrock LLC
Part #1584, 15840
Edelbrock Supercharger System
84. Secure the water pump to the water pump bracket
using the water pump strap, one (1) M8 x 30mm bolt, and a
12mm socket. NOTE: Water pump outlet needs to point
upwards once installed. Feed the recovery tank to water
pump hose through the passage hole created in the previous
step. Using one (1) 3/4" hose clamp from bag #3, secure
the hose to the water pump.
85. Using two (2) 3/4" hose clamps from bag #3, install the
water pump to LTR hose as shown. Trim the hose so that
approximately 1.5" of hose protrudes from the fitting on the
LTR.
86. Using one (1) 3/4" hose clamp from bag #3, install the
LTR to manifold hose onto the outlet port of the LTR. Route
the hose under the driver side radiator shroud towards the
manifold.
Page 20
2011-2014 Ford F-150 5.0L
Installation Instructions
Outlet
~1.5"
Brochure #63-1584
Rev. 12/11/17 - NP

Advertisement

loading

This manual is also suitable for:

15840