Download Print this page

Edelbrock 1584 Installation Instructions Manual page 15

E-force supercharger 2011-2014 ford f-150 5.0l

Advertisement

46. Using the factory green O-ring gaskets previously
removed from the stock manifold, install four (4) o-ring
gaskets onto the bottom of the driver side runner. Place the
driver side runner onto the cylinder head ports (DO NOT
bolt the runner down yet). Lay the runner down by tilting
it towards the driver side as far right as possible.
47. Install the supplied ACT harness onto the ACT sensor
located on the rear of the manifold.
48. Wrap the ACT harness around the manifold to avoid
pinching or damaging the harness. With the help from an
assistant, carefully lower the manifold onto the engine. The
manifold must be tilted towards the passenger side to allow
the actuator rod to clear the runner.
©2017 Edelbrock LLC
Part #1584, 15840
Edelbrock Supercharger System
49. Using the remaining green O-ring gaskets removed
from the stock manifold, install four (4) onto the bottom of
the passenger side runner. Tilt the manifold towards the
driver side and carefully slide in the passenger side runner
over the cylinder ports.
50. Verify all eight (8) factory green O-ring gaskets are
properly seated on the runners before proceeding.
51. Install four (4) supplied O-Rings onto the driver side
runner as shown.
52. With the help of an assistant, lift the manifold up and
carefully stand up the driver side runner. Align the runner
with the manifold using the bolt holes as alignment guides.
Page 15
2011-2014 Ford F-150 5.0L
Installation Instructions
Brochure #63-1584
Rev. 12/11/17 - NP

Advertisement

loading

This manual is also suitable for:

15840