12.5
Status of indicator light
If you wish to use a 12V-0.5W indicator light (terminal 9 - 11 of
J1, see Fig. 8), the following table shows the statuses of the
indicator light according to gate position.
Tab. 4 - Statuses of indicator light
Indicator-light status
Light Off
Lighted
Flashing
Lighted
Lighted
12.6
Testing the automated system
After programming, run an accurate functional check of the
automated system and of all the accessories connected to it,
especially the safety devices.
13

MAINTENANCE

Carry out the following jobs at least every 6 months:
•Check if the anti-crushing facility is correctly set.
•Check the efficiency of the release system.
•Check the efficiency of the safety devices and accessories.
14.
REPAIRS
For any repairs, contact authorised Repair Centres.
Gate status
Closed
Open - Open in pause
Closing
Opening
Locked