Operational Flowchart (Continued 3) - JCM GLOBAL VEGA-RC Twin Series Integration Manual

Banknote recycler
Table of Contents

Advertisement

Operational Flowchart (Continued 3)

Figure 19 depicts part five of a typical VEGA-RC Twin™ "Retrieving" Banknote recycling flow process.
Figure 19 VEGA-RC Twin Operational Flowchart (Retrieving)
Figure 20 depicts part six of a typical VEGA-RC Twin™ "Clearing Error" Banknote recycling flow pro-
cess.
Figure 20 VEGA-RC Twin Operational Flowchart (Clearing Error)
P/N 960-000169R_Rev. A {EDP #217859}
VEGA-RC Twin™ Series Banknote Recycler Integration Guide
D) From "Main" flow (See Figure 16)
a) Start retrieving Banknotes
b) Has retrieving movement completed?
c) Banknote jam occurred?
d) Indication count down
e) Motor stop
f) Send error to host
F) To "Initializing" flow (See Figure 15)
E) To "Clearing Error" flow (See Figure 20)
E) From each flow when error occurred
(See Figure 16)
a) Has error cleared?
F) To "Initializing" flow (See Figure 15)
© 2012, Japan CashMachine Co., Limited
1 6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents