Operational Flowchart (Continued 2) - JCM GLOBAL VEGA-RC Twin Series Integration Manual

Banknote recycler
Table of Contents

Advertisement

Operational Flowchart (Continued 2)

Figure 17 depicts part three of a typical VEGA-RC Twin™ "Dispensing 2" Banknote recycling flow pro-
cess.
Figure 17 VEGA-RC Twin Operational Flowchart (Dispensing 2)
Figure 18 depicts part four of a typical VEGA-RC Twin™ "Dispensing 1" Banknote recycling flow pro-
cess.
Figure 18 VEGA-RC Twin Operational Flowchart (Dispensing 1)
P/N 960-000169R_Rev. A {EDP #217859}
VEGA-RC Twin™ Series Banknote Recycler Integration Guide
B) From "Main" flow (See Figure 16)
a) Start dispensing Banknotes from
upper stacker.
b) Has dispensing movement completed?
c) Banknote jam occurred?
d) Indication count down
e) Motor stop
f) Send error to host
F) To "Initializing" flow (See Figure 15)
E) To "Clearing Error" flow (See Figure 20)
C) From "Main" flow (See Figure 16)
a) Start dispensing Banknotes from
lower stacker.
b) Has dispensing movement completed?
c) Banknote jam occurred?
d) Indication count down
e) Motor stop
f) Send error to host
F) To "Initializing" flow (See Figure 15)
E) To "Clearing Error" flow (See Figure 20)
© 2012, Japan CashMachine Co., Limited
1 5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents