9.6
Completion work after the cleaning
1
AR1019 / 0
1
AR1020 / 0
86
Lifting removal chamber:
1. Lift the removal chute 1 to the top end position (working position) and
hold it in this position from underneath with one hand.
2. Secure the two locks so that the removal chamber is held securely.
Inserting crumb tray:
1. Insert the crumb tray 1 at the bottom into the blade box.
2. Close the front door ( "Closing front door:" on page 87).
Completion work after the cleaning
07/2019 244156V03_EN
Need help?
Do you have a question about the PRIMUS smart and is the answer not in the manual?