Download Print this page

Chevrolet Camaro 12000 1968 Series Factory Assembly Instruction Manual page 260

Advertisement

ASSEMBLY
INSTRUCTIONS
3 9 1 8 8 5 5
1 9 6 8 C A M A R O 1 2 0 0 0 SERIES
BLOCK
$<2*.€W
TERMINAL
HEATING
COIL
i
/A/STALLING
/>OS/r/OA/
FROM SIDE OF £M6I#C
'#£ P*XALUL
OF
L£*T 3AA/K
V-8
VIEW FROM FRONT OF £N6MC
1. Remove water Jacket support plug carefully.
ltyOTEl Do not score machined surface of hole.
2* Thoroughly clean plug hole removing any tares, compount, paint or rough spots.
3» Apply a coating of grease or vaseline to the "O" ring and machined surface of hole (this prevents damage
to the "O" ring and makes installation easier).
4. The #10 - 32 screw is backed off by turning counter clockwise to the limit of the thread.. This allows the
center axis of the screw carrying the yoke to take up angular positions relating to the center line axis of
the heater.
5. To install into engine block, merely insert the hairpin end of the heating coil into the opening and one
end of the yoke into the inside face of the block. In this, displaced position it allows the other end of the
yoke to be pushed beyond the inside face of the engine block, (Refer to fig, 1) To insert support into
block merely center the axis of the heater and the axis of the core hole and push support in as far as it
willgo.
6. Complete assembly by tightening screw in clockwise direction. ICAUTIONi (Excessive tightening is not
• necessary). (Refer to fig. 2).
7. Route cord to front of radiator support (See "sheet Al & A2),
touch engine, hot pipes, manifold or any moving parts*
Insure that cord does not
• Cf^Yr.OiET A'.OTC.7 KVIC.OH, GJ.\C».
ENGINE BLOCK HEATER
\
INSTALLATION INSTRUCTIONS
? 1200"
•: $-';, - i 71
|REf:
toi.
L- 64369 l-
>o*M#eL.*-ty'\e/
|
i-
i-
i-
UPC
K05
A3
DA?C
SYJA
KYtSX** ftTCO&D
AUTM.
M
CK

Hide quick links:

Advertisement

loading