Download Print this page

Chevrolet Camaro 12000 1968 Series Factory Assembly Instruction Manual page 226

Advertisement

ASSEMBLY
INSTRUCTIONS
3 9 1 8 8 5 5
1968 CAMARO 1 2 0 0 0 SERIES
EVACUATING AND CHARGING
EQUIPMENT
(EXAMPLE ON& - SEE SHEET K)J
QUICK
DISCONNECT
•PROCESS COUPLE/?
YOKE ASM
QUICK
DISCONNECT
7
PROM REFRIGERANT
SUPPLY
- ^ TO VACUUM SUPPLY
TEST PROCEDURE OUTLINE:
IN ORDER TO ASSURE PROPER OPERATION O F THE UNIT, THE
FOLLOWING STEPS SHOULD BE TAKEN:
A. AFTER THE SYSTEM HAS BEEN INSTALLED, A
LEAK TEST SHOULD BE MADE.
ASSEMBLE AIR COND, HARNESS CONNECTOR TO
COMPRESSOR CLUTCH TERMINALS AFTER LEAK
TESTING.
B. A FUNCTIONAL TEST OF COMPLETED ASSEMBLY
MUST NOW BE MADE. SEE SHEET E10.
C. THE HEATING SYSTEM CAN BE CHECKED BY
MOVING THE
f
T E M P " CONTROL KNOB TO EX-
TREME RIGHT (HOT) POSITION. WITH THE
"OUTLETS" KNOB IN EXTREME RIGHT (LOWER
OTLTS) POSITION, WARM AIR WILL COME OUT
OF THE HEATER OUTLETS. WITH THE "OUTLETS'*
KNOB IN EXTREME LEFT (UPPER OUTLETS)
POSITION, WARM AIR WILL COME OUT O F THE AIR
CONDITIONING OUTLETS.
1
• CHeVtOLET MOTOft OtVI&ON, G M O
J AIRCOND ITIONING-TEST PROCEDURE
g 12000
D W G f'23'67 FM
a
REF:£?
L-
l-
L -
L -
U P C
O*TE
SYM
KVISiOH WCOKO
AUTH.
M CK
C60
E9

Hide quick links:

Advertisement

loading