Step 8. Install the 50 GHz Top to Bottom Cables
1. Place the analyzer on its side as shown in
page
4.
2. Insert cables W3 and W6 into the analyzer in the direction indicated by the arrows. It may
be necessary to guide the other end of the cables, on the top side of the analyzer, as they
are being inserted.
3. Loosely connect cables W3 and W6 at the locations shown in
all connectors are loosely connected, tighten the connectors.
Figure 11 50 GHz Top to Bottom Cables Installation, Bottom
18
Figure
11. New parts are listed in
Figure 11
Installation Note N5230-90022
Table 1 on
and
Figure
12. Once