Download Print this page

Agilent Technologies N5230AU-974 Installation Note page 14

Extended frequency range upgrade kit to upgrade option 225 to option 425 for n5230a option 225 pna-l 20 ghz, 2-port, configurable test set, with serial numbers prefixed my4640 and above

Advertisement

Step 6. Remove the 20 GHz Components
Refer to
Figure 9
for this procedure.
1. Place the analyzer bottom-side up on a flat surface.
Remove the A17 MASS 26.5
2. Disconnect the ribbon cable (item
attached to the A16 test set motherboard.
3. Disconnect the three flexible coaxial cables, W29–W31, from the MASS 26.5. Leave these
cables connected at the other end.
4. Remove the MASS 26.5 by removing the four attachment screws (item
screws for installation of the A19 MASS 50.
Remove the A20 Mixer Brick
5. Disconnect the ribbon cable (item
attached to the A16 test set motherboard.
6. Label, for re-connection later, the four flexible coaxial cables, W21–W24, that are
connected to the mixer brick. It is necessary to label these cables because they connect to
the A5 SPAM board on the top side of the analyzer and it is therefore difficult to trace their
connection path and location. Disconnect these four cables from the mixer brick but leave
them connected at the other end.
7. Remove the mixer brick by removing the four attachment screws (item
screws for installation of the A20 50 GHz mixer brick.
Remove the A25 and A26 Step Attenuators
8. Disconnect the ribbon cable (item
cables attached to the A16 test set motherboard.
9. Remove three screws (item
with the brackets attached, from the analyzer.
14
x
) from the MASS 26.5. Leave this ribbon cable
z
) from the mixer brick. Leave this ribbon cable
}
) from each of the attenuators. Leave these ribbon
|
) from each attenuator bracket. Remove the attenuators,
y
). Retain the
{
). Retain the
Installation Note N5230-90022

Advertisement

loading