Operation; Pre-Operation System Checks - Champion TRISYS SSG M3 Installation, Operation, And Cleaning

Waste systems, slow speed grinder and waterpress, close-coupled and remote
Table of Contents

Advertisement

Operation

Operation

Pre-Operation System Checks

Is the Emergency Stop, (E-Stop), button (A) on the front of the control cabinet off?
Is the grinder free of debris?
Is the grinder access door (B) closed and latched?
Is the waterpress interior clear of debris?
Is the waterpress access door (C) in place?
Is the waterpress discharge chute (D) closed?
Is a waste container (E) under the discharge chute?
Is the trough gusher head valve open?
Are the drain valves closed?
Are the floor drains clear?
Is the water supply on?
Are there any water leaks around the system?
16
(B)
(D)
(C)
(E)
Fig. 15
(A)

Advertisement

Table of Contents
loading

Table of Contents