1. Repairs schedule:

The repairs schedule, together with the service schedule, lists all relevant activities to be
performed in an efficient sequence.
Activity
1
Visual check (transport damage)
2
Record of machine data
3
Functional check / Error analysis (test mode)
4
Opening of machine
5
Visual check (leakages)
6
Mechanical systems check (functional test)
7
Defect detection
8
Modifications check
9
Service operations according to service schedule
10
Internal cleaning
11
Functional test (with open machine / leakage test)
12
Assembly
13
Final test according to test schedule
14
Steam off (winter) - only machines without rapid steam facility
15
External cleaning
16
Lubrication of brewing unit
17
Insulation test (according to the regional test specification)
18
Documentation

2. Service schedule:

Service activities

R = Replace
AT = Acoustic test
Component
Water filter
Lip seal / Water tank
Valve plug O-ring
Valve plug O-ring
Filter (brewing unit)
Hose connections
Pump
Gearmotor
Grinder
Water circuit
HWD valve
Water outlet (valve plug)
Saeco International Group
7. REPAIRS/SERVICE SCHEDULE
C = Clean
D = Descale
Activity
Equipment
C / R
R
R
R
C / VC
Grease solvent
VC
VC / AT
AT / VC
C / A
Vacuum cleaner / brush
D
Descaler (Saeco)
VC / R
C
Grease solvent / brush
REV.1 FEB.2005
VC = Visual check
A = Adjustment
Page 1/2