Timing - Saeco RI9722/11 Service Manual

Incanto s-class
Table of Contents

Advertisement

INCANTO

3. Timing

The following time chart indicates the functions of the individual components in terms to time
G rin de r mo to r
Do se r
He ati ng
a pp . 1.5 min
Pu mp
G ear m o tor
Statu s
Hea ti ng stag e
N ot e: * on ly in ma ch ine s with pr e-b re win g s yste m
Explanation:
Two processes start when the main switch is activated:
Firstly, the gearmotor is initialised: The gears move to MS1 (lower limit switch), change rotating direction,
leave MS1 and move to the home position (about 2 mm after MS1).
The instantaneous water heater is then activated for about 1 min 30 sec., heating the water to operating
temperature, whereby heating takes place for about 60 sec. continuously and then is alternated for the rest of
the time.
After activating the start button:
1.
The grinder starts operating (about 5.5 sec.).
2.
The doser is activated three times.
3.
The gears move to brewing position.
4.
Pre-brewing begins (brief pump activation).
5.
Main brewing process (duration of pump activation depending on selected coffee quantity).
6.
The gears move to home position (dregs discarded).
Saeco International Group
ap p .5 .5 sec
Sta nd -b y
REV.5 FEB.2005
4. FUNCTION/TIMING
D epending on coffee qty
*
Up
au f
Co ffe e pr oc ess
ab
d ow n
Page 7/13

Advertisement

Table of Contents
loading

Table of Contents