Standard Checks; Repairs Schedule; Service Schedule; Final Check - Saeco Aulika Sup 040R Service Manual

Table of Contents

Advertisement

AULIKA
06 STANDARD CHECKS
6.1.

Repairs schedule

Activity
1
Visual exam (transportation damage)
2
Machine data check (tag)
3
Functional check / problem analysis
4
Opening of the machine
5
Visual check
6
Functional tests
7
Elimination of defect, if any
8
Check for modifications (see Symptom Cure, new software, etc.)
9
Service activities according to the operating program
10 Internal cleaning
11 Functional test with the machine open
12 Assembly
13 Final check test
14 Circuit emptying (in winter)
15 External cleaning
16 Lubrication of the brewing unit with the appropriate grease
17 HG 701 (dielectric) insulation test
18 Documentation
6.2.

Service schedule

S
Replacement
ES Visual check
D
Descaling
CF Functional Check
Component
Water filter
Lip gasket of the water tank
O-Ring of the boiler pin
Brewing unit
Pipes, joints and Oetiker clamps
Coffee circuit pump
Hot water/steam circuit pump
Gearbox
Coffee grinder
Hydraulic Circuit
Emulsion valve unit
Multiple-way valve (solenoid valve)
P
Cleaning
TR
Noise test
R
Calibration
Activity
P/S/CF
S/CF
S/CF
ES/P/CF
ES/CF
ES/TR/CF
ES/TR/CF
ES/TR/CF
P/R/CF
D/CF
ES/S/CF
ES/S/CF
Rev. 00 / July 2012
Support/tool
Degreaser / Grease
Vacuum cleaner / brush
Saeco Descaler
Page
01
/ 02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents