For More Information; Getting Help - Eaton Powerware 225 kVA Three-Phase Power Distribution Unit Installation And Operation Manual

Table of Contents

Advertisement

1.8

For More Information

1.9

Getting Help

EATON Powerware
Refer to the Powerware Energy Management System (EMS) Level 3 Interface User's
Guide for the following additional information:
S
Branch circuit monitoring configuration instructions, including branch circuit
parameter setup and alarm setup.
S
Branch circuit monitoring operation, including using the PDU LCD and menu map.
S
Branch circuit monitoring troubleshooting, including alarms and conditions, and
service and support.
Visit www.powerware.com or contact an Eaton service representative for information
on how to obtain copies of this manual.
If help is needed with any of the following:
S
Scheduling initial startup
S
Regional locations and telephone numbers
S
A question about any of the information in this manual
S
A question this manual does not answer
Please call the Eaton Corporation Help Desk for Powerware products at:
1−800−843−9433
United States:
1−800−461−9166 ext 260
Canada:
Call your local service representative
All other countries:
®
225 kVA PDU Installation and Operation Manual
1−919−870−3028
or
S
164201629 Rev D www.powerware.com
INTRODUCTION
1−11

Advertisement

Table of Contents
loading

Table of Contents