Concentric Pipe - GasTech 24kW Baykan Starplus Manual

24-28-32 kw mono-thermic c type hermetic wall hung boilers, 24-28 kw mono-thermic b type flue duct wall hung boilers, 24 kw bithermic type-c hermetic wall hung boiler
Table of Contents

Advertisement

CAUTION

CONCENTRIC PIPE

If concentric waste pipe assembly is shorter than specified;
......mt+bracket for BAYKAN 24KW ( P top ....Pa)
......mt+bracket for BAYKAN 28KW ( P top ....Pa)
.......mt+bracket for BAYKAN 32KW ( P top ....Pa)
A diaphragm must be used between the duct kiti and wall hung boiler outlet.
Parallel pipe Connection
If Parallel waste pipe assy. is shorter than specified
......mt+bracket for BAYKAN 24KW ( P top ....Pa)
......mt+bracket for BAYKAN 28KW ( P top ....Pa)
...... mt+bracket BAYKAN 32KW ( P top ....Pa)
A diaphragm must be used between the duct kiti and wall hung boiler outlet.
DIAPHRAGMØ
Table of waste gas capacity losses for concentric and parallel waste gas kit parts (Table of fume
capacity loss for components of concentric and parallel pipes discharge kit)
PIPE SYSTEM AS
ONE WITHIN
ANOTHER
Ø 60/80
SEPERATED PIPE
SYSTEMS
Ø80 Ø80
PIPE SYSTEM AS
ONE WITHIN
ANOTHER
Ø80-125
BAYKAN ISI SIST.SAN.TIC.AS
BAYKAN 24KW
37
COMPONENT
Terminal Pipe L.990
Insertion L.1000 M-F
Vertical flanged connection M
Bracket 90° M-F
Bracket 45°
Insertion Pipe M-F L.1000
Insertion Pipe M-F L.500
Bracket 90° M-F
Bracket 45°
Waste gas pipe L.990
Air inlet pipe L.950
Lowered Duct 60/100 L.1195
.
BAYKAN 28KW
41
P (Pa)
25
6
15
7
6
3
1.5
14
7
3.5
1.5
21
- 16 -
BAYKAN 32KW
44
Equivalent duct
lenght
2.8
1
1.3
1
1
0.5
3
1.3
0.8
1.5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

28kw baykan starplus24kw baykan sun24kw baykan moon28kw baykan sun32 kw baykan sun28kw baykan moon

Table of Contents