FILLING THE WATER FOR CENTRAL HEATING SYSTEM

After connecting electricity, gas and water connections, start filling the water for central heating
system and circuit. This procedure must be performed with care.
3.1 Filling Operation for Baykan Sun Model
Press "A" switch for running your wall hung boil (Figure13), the water pressure of central
heating system will be displayed on the screen.
Turn the radiator inlet valves to on position, ensure that the air discharge cocks are open.
Slowly turn the filling valve on. (Fig. 8), turn the water pressure to 1,5-2 bars.
Turn off the air cocks on the radiators immediately as the water comes..
Ensure that the water pressure displayed on the screen is between 1,5 and 2 bars.
Carry on until the air is evacuated.
Caution: While operating, always compare the value of the central heating system
displayed on screen to the value on the label.
3.2 Filling Operation for Baykan Star – Starplus – Moon Models
Turn the radiator inlet valves to on position,
ensure that the air discharge valves are open.
Slowly open the filling valve (Fig. 8), turn the
water pressure to 1,5-2 bars.
Turn off the air cocks on the radiators
immediately as the water comes.
Check that the water pressure on display
screen is between 1,5 and 2 bars.
Carry on until its evacuated.
Caution: While operating, always compare the
value of the central heating system displayed on
screen to the value on the label.

4. WASTE GAS FLUE DUCT CONNECTIONS

The connections to be made with the waste gas pipes and (if available) the discharge pipes on the walls
must be performed in conformity with the technical specifications of Gas Distribution Company.
In the buildings where there are more than one domiciles, the heating systems must be connected to
the discharge systems, fume pipes or flue ducts on the roof with sufficient space during the following
cases :
THE FLUE DUCT HAS A VERY IMPORTANT ROLE IN THE EFFICIENT RUNNING OF THE DEVICE
THUS IT MUST BE INSTALLED IN CONFORMITY WITH THE TECHNICAL SPECIFICATIONS.
FOR DEVICES TYPE B11
Connection of devices to the flue ducts or fume pipe is accomplished by means of fume channels. The
said fume channels must be connected to the flue duct or fume pipe inside the installing area of device
or a place nearby and must conform the following properties.
It must not leak and strong and durable materials must be used which can stand the mechanical
constrains that may arise in time and the heat and actions of waste materials.
The temperature of the fumes at some point of the flue duct or at any extra conditions should not be
higher than the heat and temperature of condensation point.
The connections must be based ensuring no leakages. The impermeability materials used must
stand the heat and corrosion.
BAYKAN ISI SIST.SAN.TIC.AS
, (with open chamber)
BS
.
- 12 -
Res. 8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

28kw baykan starplus24kw baykan sun24kw baykan moon28kw baykan sun32 kw baykan sun28kw baykan moon

Table of Contents