Installation Instructions Page 1 of 2 Casegood Desk Recommended Tools #3 Phillips Head Hardware Used • #14 x 1 ” Pan Head Wood Screws Step 1 Level Pedestals • Position pedestals in desired location. • Level all pedestals front-to-back and side-to-side by rotating adjustable glides.
Page 2
Installation Instructions Page 2 of 2 Casegood Desk Step 3 Attach Worksurface to Pedestals (continued) • Insert wooden dowels into pedestals. • Carefully lower worksurface onto pedestals, inserting dowels into proper z-bar holes. • Remove top drawers and secure worksurface to pedestals using fastening knobs.
Need help?
Do you have a question about the SWISH Casegood Desk and is the answer not in the manual?
Questions and answers