Assembly
Instructions for commissioning
5.4 Establishing the electrical connection
5.5 Instructions for commissioning
92
2.
Check the maximum load per bearing:
ð B
and B
k a
If B
k a, b
Personal:
Schutzausrüstung:
1.
The electrical connection must be established by a qualified
electrician in accordance with the following instructions:
Ä Installation instructions for the Multilift I/II
n
n
Ä Installation instructions for controller
2.
Make sure that a continuously secure electrical connection is
maintained and that all conductor wires are correctly
stripped.
Adhere to the following instructions for commissioning:
n
Make sure that the assembly workstation is aligned horizontally
using the feet.
n
Make sure that the mains plug for the lifting columns is freely
accessible after installation of the assembly workstation.
n
Provide additional safeguards for any crushing and shearing
points which may occur after installing the assembly worksta-
tion in the operator's construction.
n
Only operate the assembly workstation in perfect condition.
The assembly workstation must not be commissioned with
damaged modules (in particular lifting columns).
n
Before each commissioning procedure, make sure that there
are no persons or objects in the danger area.
n
If the lifting columns start up on their own due to a fault, pull the
mains plug.
Assembly workstation RK Easywork
are identical when the load is in the centre.
k b
> 1, the application values must be reduced.
n
Qualified electrician
n
Protective clothing
n
Safety shoes