Before Beginning Installation • Read through the entire instruction thoroughly • A minimum of 2 persons is required for this assembly • These instructions reflect typical assemblies. They may not match your specific configuration.
Required Hardware • Bolt – 3/8” UNC x 5/8” L-HW2248 • Screw – 10-12 x 1-1/4” PHIL • Screw - #12 x 1” PAN-PHIL • Draw-Tight Hardware • Bolt – 5/16 – 18 x 5/8 Fit Socket Head Cap (Post Leg Base Only)
Page 6
Flow NT Table Exploded End Base Center Base Main Beam...
Page 7
Installation Prep – 3-Piece and 4-Piece Tops • 3-Piece and 4-Piece tops include gussets for extra support. – Locations are marked on the main beam. • Slide the gusset’s clamp bar onto the main beam BEFORE attaching the beam to the bases (facing outward).
Page 8
Step 1: Tables over 120” • Locate beam labels and match for correct placement of bases. • Loosen clamp bars from base. • Attach end bases by sliding the clamp bars into the beams. – Beams should be 1/8” from the top of the base panel. •...
Page 9
Step 5: Work Surface Alignment • Use a level and adjust glides on the bottom of the bases to level table frame before adding the top. • Align the “L” shaped notes on the bottom of the top with the corners of the bases. •...
Page 11
Flow NT Table – Post Leg Base End Base Center Base Main Beam...
Page 12
Installation of Post Leg Base • Slide the clamp bars from the end base into a beam. • Tighten the screws that fasten the end base to the beam. • Then continue with Step #2 in instructions above.