Rinnai Slimfire 252 Operation & Installation Manual page 29

Hide thumbs Also See for Slimfire 252:
Table of Contents

Advertisement

Step 5.
Spillage Testing
5.1 Check for spillage of combustion product into the space being heated in accordance with the
requirements of AS/NZS5601 "Gas Installations" and local regulations.
The Requirements of AS / NZS 5601 include:
(a) Checking whether mechanical extraction ventilation draws air through flue systems or
IMPORTANT
chimneys or not. If yes, this will most likely result in combustion product spillage from
appliances during their operation.
(b) Checking whether the operation of appliances and flue systems or chimneys is satisfactory.
(c) A method for determining the additional fixed ventilation area required to counteract the
effect of mechanical extract ventilation.
Spillage tests and countermeasures (when required) are critical for safe operation of the appliance.
With the fascia installed check for spillage at the downdraft diverter relief opening (A) which is
WARNING
located at the front top of the appliance, checking for spillage MUST BE preformed along the
entire length of the this opening as shown in the diagram below.
Be aware that located directly below the downdraft diverter relief opening (A) is the convection
air outlet opening (B), when checking for spillage DO NOT test for spillage in this opening.
If unsure contact Rinnai for advice.
A
Step 6.
Complete Installation Checklist and Details
6.1 Complete the "Installation & Commissioning Checklist" on page 30
6.2 Fill out the installation details into the "Installation Record" on page 31
6.3 Make sure that this instruction book is left with the customer.
Rinnai
A
Fascia is not shown in the above two images for reasons of clarity!
29
COMMISSIONING
B
RIBF25 OIM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ribf25

Table of Contents