Installation Of Sensors (F,G) - FPZ SCL K05 MS-MOR Instructions Manual

Lateral channel blowers-exhausters
Hide thumbs Also See for SCL K05 MS-MOR:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 29
The unit is designed to be used for conveying flammable gas and is sealed.
Do not start the machine before connecting and activating the unit and system surveillance system.

12.3 INSTALLATION OF SENSORS (F,G)

Proceed with installation of the machine in the system by fixing the sensors (suitable for the use and in particular for the Atex
environment considered) in their special seats and connecting them to the control system according to the sensor instructions and
system diagram:
G 1/4" threaded hole for
connection of
PRESSURE SENSOR (suction)
The position shown allows the monitoring of any impeller unbalance due to deposits on the blades
ATTENTION
F)
Pressure sensor
The pressure sensor installed must be suitably set to the maximum positive or negative pressure specified on the rating plate or
according to system operation limits.
This signal must be connected to an alarm and stop device (non-automatic reset) that automatically shuts off the power to the machine.
G)
Temperature sensor
The temperature sensor must be adjusted to intervene, shutting off the power to the machine at a temperature not exceeding 125°C.
This signal must be connected to an alarm and stop device (non-automatic reset) that automatically shuts off the power to the machine.
ENERGOEKONOM spol. s r.o., Wolkerova 433, CZ-250 82 Úvaly, Czech Republic, Tel.: +420 281 981 055, info@energoekonom.cz, www.energoekonom.cz
Danger of explosion!
G 1/4" threaded hole for
connection of
PRESSURE SENSOR (delivery)
G 1/4" threaded hole
for connection of
TEMPERATURE SENSOR (delivery side)
39 / 100

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scl k06 ms-mor

Table of Contents