Cisco IR1101 Hardware Installation Manual page 47

Industrial integrated services router
Hide thumbs Also See for IR1101:
Table of Contents

Advertisement

Installing the Router
Pluggable Module
Figure 24: USB Cover Finished Installation
Step 8
Slide the Pluggable Module into the device as shown in
Figure 25: Pluggable Module Insert, on page
42. The latch
lock screw (1) aligns with the screw hole (2) on the front of the device. Push the Pluggable Module all the way into the
device until you feel it seat, and then torque the latch lock screw 8-10 inch-pound (0.9 to 1.1 newton meter).
IR1101 Industrial Integrated Services Router Hardware Installation Guide
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents