Configuring the RS485 Bus for Battery and Meter
Connection
This section describes how to set up the RS485 communication between the       i nverter, meter, StorEdge 
Interface, and one battery. 
To configure the RS485 bus:
 1.  Turn the inverter ON/OFF switch to OFF.
 2.  Select Communication è RS485-1 Conf è Device Type è Multi Devices. A list of devices is 
displayed.
D e v i c e
M e t e r
M e t e r
M e t e r
B a t t e r y
B a t t e r y
 3.  Select Meter 2. The meter configuration screen is displayed (SolarEdge meters are pre-configured to 
Device ID 2):
D e v i c e
P r o t o c o l
D e v i c e
C T
R a t i n g
M e t e r
 4.  Configure the meter:
 a.  Select Device Type è Revenue Meter
 b.  Select Protocol è WattNode
 c.  Verify that Device ID is set to  2.
 d.  Set the CT value that appears on the CT label: CT Rating è <xxxxA>. 
If CT resets to 0, check the communication as described in step b of verify the connection:below.
 e.  For a meter installed at the grid connection point select Meter Func.è Export+Import.
E x p o r t + I m p o r t
E x p o r t
C o n s u m p t i o n
P r o d u c t i o n
E x t .
I m p o r t
N o n e
The selected option is displayed in the RS485 Conf screen as <E+I>.
-StorEdge Interface Installation Guide MAN-01-00380-1.1
T y p e
< M L T >
1
< - - - >
2
< - - - >
3
< - - - >
1
< - - - >
2
< - - - >
T y p e
< M T R >
< W N >
I D
< 2 >
< 0 >
F u n c .
< N o n e >
P r o d u c t i o n
Chapter 4: System Configuration
21

Advertisement

Table of Contents
loading

Table of Contents