GENERAL MAINTENANCE

The operator should make a habit of doing general maintenance on the Embosser so as to ensure a correct and
long lasting functioning of the system.
ATTENTION! DANGER
The machine when at work has several moving units.
Do not work on the inside of the machine.
Do not remove the cover or guards except for the front cover which is used to load the
plates.
The maintenance should be done with the machine switched off.
Routine maintenance as listed below should absolutely be followed:
After the first 8 hours of embossing work, switch off the machine and remove the power supply
cable. Lift up the front cover and proceed as follows:
ATTENTION! DANGER
IMPORTANT: Do not remove the cover and the guards that are present inside the
embossing machine.
PES197 & PES197/E: PA25609A01_01
PES197 and PES197/E: ENGLISH
CAUSE
"Top translation table" setup not
configured
Communication error
Communication error
Miss a embossing field
Protocol error
Too much fields in the mask
Embossing fields out of range
Embossing fields out of range
Protocol error. The command has an
invalid Header
Protocol error. The command has an
invalid BCC
Protocol error. The command has an
invalid Redundancy Code
Reload the setup parameters
Control the setup configuration of the
embosser or Host message strings
Control the setup configuration of the
embosser or Host message strings
Control the Host message strings
Control the Host message strings
Control the Host message strings
Control the Host message strings
Control the Host message strings
Verify the command string sent to the
machine
Verify the command string sent to the
machine
Verify the command string sent to the
machine