Canon PC1000s Service Manual page 122

Table of Contents

Advertisement

CHAPTER 2 USING THE MACHINE
Control Panel Test (6-7: OPERATION PANEL)
This test is used to check the operation of the control panel.
A press on '7' on the keypad from the control panel selects the OPERATION PANEL Test
menu, enabling the following tests:
LCDTest
A press on the Start key under OPERATION PANEL test will start LCD test, in which
the screen will be filled with the character H; another press will cause the screen to turn
totally black.
LED Lamp Test
A press on the
Start
key after the LCD test selects the LED lamp test, turning all lamps
in the control panel to go ON.
Control Key Test
A press on the Start key after the LED lamp selects control key test 1. Press the key in-
dicated on the LCD; if it goes out, the operation is normal.
When all characters have gone out, control key test 2 (if equipped with fax functions) is
started. As in the case of operation key test 1, press the key indicated on the LCD: the op-
eration is correct if it goes out.
Key Correspondence for Control Key Test 1 (if not equipped with fax functions)
I
[J]
[HI [Dl
I I
I
Same as LCD indications.
t9
[I1
[GI
[Bl
F02-320-15
C O P Y R I G H T Q 2 0 M C A N O N
INC.
CANON
PC1
OOO?hmageCU\ S S
D600s
REV.
1
A U G . 2 0 0 2

Advertisement

Table of Contents
loading

This manual is also suitable for:

Imageclass d600s

Table of Contents