Download Print this page

Maintenance And Cleaning; Sanitisation Guide - Borg & Overstrom u2 Install & Operation Manual

Hide thumbs Also See for u2:

Advertisement

Maintenance & Cleaning

Sanitisation Guide

NOTE: All maintenance operations must be carried out with the dispenser switched off. This
operation must only be carried out by trained staff. Every 6 months a sanitisation procedure is
recommended as follows:
1
Turn off incoming mains water.
4
Use Bioguard Hand Gel and put
on protective gloves.
7
Turn on incoming water, allow
service cartridge/doser to fill.
Borg & Overström
Briefly dispense cold/ambient
water to release internal water
pressure from the machine.
Add 25 ml of Bioguard Internal
Sanitisation fluid to a clean and
empty service filter cartridge.
Dispense water using the cold
dispense lever until the water
appears pink. Briefly dispense
using the ambient lever too.
Install & Operation Manual
2
5
8
PINK
21
3
Remove the existing filter.
6
Connect to filter head.
9
5
mins
Leave the solution inside machine
for sanitisation to take effect
(minimum 5 minutes) while
thoroughly cleaning the machine
externally
GB

Advertisement

loading