Electrical Installation
1
9
10
L1
L2
L3
PE
Figure 4.2 EMC-compliant Electrical Connection
1
PLC
2
Adjustable frequency drive
3
Output contactor
4
Grounding rail (PE)
5
Cable insulation (stripped)
Table 4.1 Legend to Figure 4.2
NOTICE!
EMC INTERFERENCE!
Run cables for input power, motor wiring and control wiring in three separate metallic conduits. Failure to isolate
power, motor and control cables can result in unintended behavior or reduced performance. Minimum 7.9 in [200 mm]
clearance between power, motor and control cables is required.
MG20MA22
Instruction Manual
2
11
8
6
6
7
8
9
10
Danfoss A/S © 10/2014 All rights reserved.
3
4
5
u
v
w
PE
7
Cable connector
Motor, 3-phase and PE
Line power, 3-phase and reinforced PE
Control wiring
2
Equalizing min. 0.025 in
[16 mm
2
]
17
4
4
Need help?
Do you have a question about the VLT AQUA Drive FC 202 and is the answer not in the manual?