Dryer Enclosure Requirements - ADC AD-170SE Installation Manual

Adc gas dryer installation manual
Hide thumbs Also See for AD-170SE:
Table of Contents

Advertisement

C. DRYER ENCLOSURE REQUIREMENTS
Even though a 12-inch (30.48 cm) clearance is acceptable, it is recommended that the rear of the dryer be
positioned approximately 24-inches (60.96 cm) from the nearest obstruction (i.e., wall) for ease of installation,
maintenance, and service. Bulkheads and partitions should be made from noncombustible materials. The
clearance between the bulkhead header and the dryer must be a minimum of 4-inches (10.16 cm) and must not
extend more than 4-inches (10.16 cm) to the rear of the front. A 2-inch (5.08 cm) clearance is required between
the bulkhead facing and the top of the dryer.
NOTE: Bulkhead facing should not be installed until after the dryer is in place. Ceiling area must be
located a minimum of 12-inches (30.48 cm) above the dryer top console (module) and
18-inches (45.72 cm) for steam models.
NOTE: When fire sprinkler systems are located above the dryers, a minimum of 18-inches (45.72 cm)
above the dryer console (module) is required. Dryers may be positioned sidewall to sidewall,
however, 1 or 2-inches (2.54 or 5.08 cm) is suggested for ease of installation and
maintenance. Allowances must be made for the opening and closing of the control door and
the lint door.
13

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AD-170SE and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF