B. ADJUSTMENTS
7 DAYS AFTER INSTALLATION AND EVERY 6 MONTHS THEREAFTER
Inspect bolts, nuts, screws, (bearing setscrews), grounding connections, and nonpermanent gas connections
(i.e., unions, shutoff valves, and orifices). Fan (impellor) V-belts, along with the motor and drive belts should be
examined and replaced if necessary. Tighten loose V-belts when necessary. Complete operational check of
controls and valves. Complete operational check of ALL safety devices (i.e., door switches, lint drawer switch,
sail switch, burner, and hi-limit thermostats).
NOTE: Squirrel cage type fan (impellor) on the blower motor must be inspected and cleaned
every 6 months.
C. LUBRICATION
The fan shaft bearings and ALL the basket (tumbler) drive shaft and idler shaft bearings must be lubricated
every 3 months. Use Shell Alvania #2 grease or its equivalent. Lubrication is necessary or premature bearing
failure will be the result.
The motor bearings are permanently lubricated and DO NOT require to be serviced.
43

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AD-170SE and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF