Replacing The Fuses; Terminal Connection Table - BADU OmniTronic Translation Of Original Operation Manual

Hide thumbs Also See for OmniTronic:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 54
Contact load
Z1, Z2
11, 12, 14
Connection load
Lp, Np
Rocker switch
The rocker switch installed on the front turns the whole device on
and off.
The light on the rocker switch displays the operational readiness.
If the device is turned off, no contact information can be output via
Z1-Z2.
5.3.1

Replacing the fuses

There are two different fuses present.
4 A fuse for pumps with asynchronous motors
315 mA to safeguard the control unit's circuit board
5.3.2

Terminal connection table

Fig. 5
04|2019
maximum 2 A, 250 V~ AC3
maximum 2 A, 250 V~ AC3
maximum 4 A, 250 V~ AC3
Installation
EN 33

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for BADU OmniTronic

Table of Contents