Daqm904A Relay Contact Resistance Verification (Optional) - Keysight Technologies DAQ970A Service Manual

Data acquisition system
Hide thumbs Also See for DAQ970A:
Table of Contents

Advertisement

DAQM904A relay contact resistance verification (optional)

This optional procedure uses an external DMM to make 4-wire ohms
measurements across the relay contacts on the DAQM904A.
Ensure that you have read the
NOTE
1 Connect copper shorts from H to L on each of the eight columns (COL1
For all steps in the following procedures, after connecting or moving test leads,
NOTE
route your wiring for proper strain relief and install the module cover. Install the
DAQM904A in slot 200 of the DAQ970A/DAQ973A.
2 Open all channels on the module by performing a Card Reset (press [Module]
Keysight DAQ970A/DAQ973A Service Guide
through COL8) as shown below. Connect the HI, LO, Sense HI, and Sense LO
leads to ROW1 as shown below.
select Card Reset; then press Yes to confirm).
Performance Verification
"Plug-in Module Test Considerations"
3
on page 76.
85

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Daq973a

Table of Contents