Keysight Technologies DAQ970A Service Manual page 80

Data acquisition system
Hide thumbs Also See for DAQ970A:
Table of Contents

Advertisement

3
Performance Verification
This procedure uses an external DMM to make resistance measurements to check
the relay contact resistance for the relays used in Channel 21 and 22 and the F501
and F502 fuses on the DAQM901A. This procedure does not require copper shorts
from H to L for Channel 21 and 22 at the beginning of the test.
1 Open all channels on the module by performing a Card Reset (press [Module]
2 Shunt relays K523 and K524 (indicated as Channel 93 and 94 respectively in
3 K522 (indicated by Channel 95 in the front panel module simplified schematic)
4 Short H to L for Channel 22. Plug the module back into the DAQ970A/
5 Set Channel 22 to measure DCI or ACI. Press [Monitor].
6 Remove the module from the DAQ970A/DAQ973A mainframe without
7 Make a 4-wire resistance measurement across AMPS COM H and AMPS COM
80
select Card Reset; then press Yes to confirm). Remove the module from the
DAQ970A/DAQ973A mainframe.
the front panel module simplified schematic) are closed after the reset. Make a
4-wire measurement across H and L for Channel 21 and 22 with an external
DMM. Ensure that the resistances are less than 2 W. This will be the K523 and
K524 resistance.
connects AMPS COM to Channel 21 after the reset. Make a 4-wire resistance
measurement across AMPS COM H and AMPS COM L with an external DMM.
This will be the sum of the K522 and K523 resistances. Ensure that the
resistance is less than 2 W.
DAQ973A mainframe.
powering down the mainframe. K522 should retain its connection of AMPS
COM to Channel 22.
L with an external DMM. This is the K522 resistance. Ensure that the resistance
is less than 2 W.
Keysight DAQ970A/DAQ973A Service Guide

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Daq973a

Table of Contents