3.11 Verifying the installation

After you complete the installation, verify that:
There is enough space for heat dissipation around the switch, and the rack is stable.
The grounding cable is securely connected.
The correct power source is used.
The power cords are properly connected.
All the interface cables are cabled indoors. If any cable is routed outdoors, verify that
the socket strip with lightning protection and lightning arresters for network ports have
been properly connected.
Figure 3-37 SFP/SFP+/QSFP+ transceiver module
LC connector
(1)
(2)
(1) TX
3-32
3. Installing the switch
(2) RX