Cd-Etia Blade Setup; Installing The Cd-Etia Blade; System Requirements; Installation And Safety Precautions - NEC SMB8000 Manual

Etia, poe
Hide thumbs Also See for SMB8000:
Table of Contents

Advertisement

Chapter 3
S
1
I
ECTION
NSTALLING THE
1.1
1.2
___________________________________________________________________________________
Gigabit PoE Switch Manual

CD-ETIA Blade Setup

CD-ETIA B

System Requirements

This blade can be installed in any universal slot in the controlling chassis (slots
2~6) and expansion chassis (slots 7~24).
The maximum number of CD-ETIA blades that can be installed in one chassis
is limited by system power. Refer to
on page
2-5.

Installation and Safety Precautions

Observe the following precautions when installing the
blades to avoid static electricity damage to hardware or
exposure to hazardous voltages.
Never install telephone wiring during a lightning storm.
Never install telephone jacks in wet locations unless the jack is specifically
designed for wet locations.
Never touch uninsulated telephone wires or terminals unless the telephone
line is disconnected at the network interface.
Use caution when installing or modifying telephone lines.
Ground the Controlling and Expansion chassis before installing or removing
the blades.
The Expansion Chassis must be installed with the system power OFF.
Do not touch the blade components.
Carry the blade in a conductive polyethylene bag to prevent static electricity
until ready to install the blade.
When installing or removing the blades from the chassis, the installer must
wear a grounded wrist strap to protect the blade from static electricity.
This blade is hot-swappable.
LADE
3.4 Power and Thermal Considerations
3 - 1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents