Technical specifications
The following table provides the technical specifications for the switches in this series. Ensure that
the area where you install the switch and where it operates meets these requirements.
Warning:
To avoid bodily injury from hazardous electrical shock and current, never remove the top of the
device. No user-serviceable components are inside.
Table 1: Physical specifications
Height
Width
Depth
Weight (switch weight with one PSU. Where, PSU
approximately weighs 1.6 kg)
February 2016
4.4 cm – 1RU
17.32 inch (440 mm or 44 cm) - 19 inch rack
mountable
18.89 inch (480 mm or 48 cm)
• ERS4926GTS: 7.2 kg
• ERS4926GTS-PWR+: 7.9 kg
• ERS4950GTS: 7.3 kg
• ERS4950GTS-PWR+: 8.0 kg