Download Print this page
Avaya VSP 4000 4450GTX-HT-PWR+ Quick Install Manual
Avaya VSP 4000 4450GTX-HT-PWR+ Quick Install Manual

Avaya VSP 4000 4450GTX-HT-PWR+ Quick Install Manual

Advertisement

Quick Links

Avaya
Virtual Services Platform 4000
4450GTX-HT-PWR+

Quick Install Guide

This document provides information and instructions to install
and commission a factory-supplied Avaya Virtual Services
Platform 4000 4450GTX-HT-PWR+ switch. This hardware
model is temperature hardened and designed to withstand
industrial-grade high temperatures. You can download all
documents referenced in this guide at http://support.avaya.com.
1
Before you start
Confirm that you have the following tools and cables:
• Phillips #2 screwdriver
• Console cable that matches the console connector on the
switch (DB-9 or RJ-45)
• Electrostatic discharge (ESD) cable
2
Unpack the equipment and verify
package content
Note: Observe ESD precautions when unpacking.
Speed
1
USB
PWR
Status
3
RPS
5
7
Up
9
11
Down
Base
13
15
Speed
2
17
4
19
21
6
8
23
25
10
12
27
14
16
29
31
18
33
35
20
22
37
39
24
26
41
28
43
45
30
32
47
4850GTS
34
36
-HT-PWR
+
38
40
42
44
46
48
1. Avaya Virtual Services Platform (VSP) 4000 4450GTX-HT-PWR+
switch with one power supply installed.
2. Rack-mounting hardware that includes:
a. Rack-mount brackets
b. Screws to attach brackets to the switch
c. Screws to attach the switch to the equipment rack
3. Rubber footpads.
4. AC power cord with an IEC 60320 C16 connector.
(Note: A power cord is not included for the A variant of
the switch.)
5. Documentation that includes:
a. Locating the latest software and product release notes
(NN46251-106)
b. Regulatory Guide (NN46251-105)
c. Quick Install Guide (this document)
d. China RoHS paper
3
Verify power supply unit (PSU)
specifications
The VSP 4000 4450GTX-HT-PWR+ switch supports two
field-replaceable AC PSUs. One PSU is supplied with the
chassis. Optionally order an additional PSU for redundancy and
load sharing.
VSP 4000 4450GTX-HT-PWR+ AC power and
temperature specifications
Specifications
Description
PSU Specifications
Primary PSU (without power cord):
1000-watt AC PoE+ high-temperature
field-replaceable power supply
(replacement order code: EC4005A03-E6)
Redundant PSU (without power cord):
1000-watt AC PoE+ high-temperature
field-replaceable power supply
(replacement order code: EC4005A03-E6)
Primary PSU
(with North American power cord):
1000-watt AC PoE+ high-temperature
field-replaceable power supply
(replacement order code: EC4005E03-E6)
Redundant PSU
(with North American power cord):
1000-watt AC PoE+ high-temperature
field-replaceable power supply
(replacement order code: EC4005E03-E6)
Note: The 1000-watt AC power supply uses the IEC
60320 C16 AC power cord connector.
Power over Ethernet
The maximum PoE+ wattage is
as follows:
(PoE)
and
0ºC to 50ºC
50ºC to 70ºC
Power over Ethernet
1 PSU
400 watts
860 watts
Plus (PoE+)
2 PSUs
1660 watts
832 watts
specifications
The VSP 4450GTX-HT-PWR+ has 48 ports that are
capable of POE and POE+ power support. The
following tables list the PoE and PoE+ support based
on the operating temperature.
1 PSU:
0ºC to 50ºC 50ºC to 70ºC
PoE
48 ports
23 ports
support on
PoE+
26 ports
13 ports
support on
2 PSUs:
0ºC to 50ºC 50ºC to 70ºC
PoE
48 ports
48 ports
support on
PoE+
48 ports
26 ports
support on
Operating
The supported operating temperature is 0ºC to 70ºC.
temperature
Caution: To prevent equipment damage, ensure
specifications
that the operating temperature range is strictly
adhered to.
4
(Optional) Install redundant PSU
Use this procedure to optionally install a redundant power supply.
Note: The switch ships with a filler panel in the second power
supply position. This filler panel must stay in place if you do not
intend to install a second power supply. Each power supply bay
must always be populated with either a cover or a power supply for
proper air-flow management.
1. If a blanking plate covers the required power supply slot,
remove the blanking plate before attempting to insert the
power supply.
2. Insert the power supply into a front power supply slot as
illustrated.
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41
43
Speed
PWR
Status
USB
RPS
Up
Down
Base
Speed
2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
44
3. Verify that each power supply is fully seated in the slot.
Secure the power supply with the two thumb screws.
Note: The switch chassis can prevent an incorrect installation
of a power supply. If you insert a power supply upside down, it
will not fully insert and the thumb screws will not engage.
4. After you install a power supply, connect AC power.
5
Mount the VSP 4000 switch
Caution: To protect the VSP 4000 switch against ESD damage, do
the following before you connect the data cables to
the device:
• Use antistatic wrist straps. Ensure that the strap has good skin
contact. Do not remove the wrist or ankle strap until the
installation is complete.
• Ensure that you properly ground work surfaces and
equipment racks.
• Avoid contact between equipment and clothing.
• Avoid touching the connector pins.
a. Table or shelf mounting
1. If you mount the VSP 4000 switch on a table or shelf, attach
the included rubber footpads as indicated. The surface must
support the combined weight of the switch and attached
cables (15-20 pounds [7 to 9 kilograms]).
2. Set the device on a flat
surface near an AC power
source. Allow at least 2
inches (5.1 cm) of space
on all sides for proper
air flow, and at least
5 inches (12.7 cm) at
the back for power
cord clearance.
b. Rack mounting
Prepare the rack:
1. Allocate 2U of vertical space for each switch in an EIA or
IEC-standard 19-inch (48.2-centimeter) equipment rack.
Ensure that the equipment rack is stable and securely attached
to a permanent structure.
2. Ground the rack to the same grounding electrode used by the
power service in the area. The ground path must be permanent
and must not exceed 1 ohm of resistance from the rack to the
grounding electrode. Avaya recommends using a filter or
surge suppressor.
VSP 4450GTX-HT--PWR+
45
47
Mount the switch:
46
48
1. Attach an L-bracket to each side of the switch using the #2
Phillips screwdriver as illustrated.
1
PWR
Speed
3
USB
Status
5
RPS
7
9
Up
11
Down
13
Base
15
Speed
17
2
19
4
21
6
8
23
25
10
27
12
29
14
16
31
33
18
35
20
37
22
24
39
26
28
30
32
34
36
38
40
2. Slide the switch into the rack as illustrated. Insert and tighten the
rack-mount screws.
1
PWR
Speed
USB
Status
3
5
RPS
7
9
Up
11
Down
13
Base
Speed
15
17
2
19
4
21
6
23
8
10
25
27
12
29
14
31
16
18
33
35
20
37
22
39
24
26
28
30
32
34
36
38
40
For more details on installing the VSP 4000, see
Installing the Avaya Virtual Services Platform 4000
VSP4450GTX-HT-PWR+ (NN46251-304).
41
43
45
47
4850
GTS
-HT-P
WR+
42
44
46
48
41
43
45
47
4850
GTS
-HT-P
WR+
42
44
46
48

Advertisement

loading

Summary of Contents for Avaya VSP 4000 4450GTX-HT-PWR+

  • Page 1: Quick Install Guide

    1 ohm of resistance from the rack to the 2. Insert the power supply into a front power supply slot as grounding electrode. Avaya recommends using a filter or PSU Specifications Primary PSU (without power cord): illustrated.
  • Page 2 4. Grasp the transceiver between your thumb and forefinger. Connector Pin Number Signal ID 20 and name Avaya. 5. Insert the transceiver into the proper SFP/SFP+ slot on the Carrier detect (not used) switch as illustrated. Apply a light pressure to the transceiver 1.