Connecting To The Dte - Paradyne FrameSaver SLV 9126 Installation Instructions Manual

1-slot unit
Hide thumbs Also See for FrameSaver SLV 9126:
Table of Contents

Advertisement

Verification Check:
Check the DSX LEDs. Is the Sig (DSX-1 signal) LED on, and are the DSX-1 OOF
(out of frame) and ALM (alarm) LEDs off?
– If so, the DSX interface is set up correctly and ready to communicate.
– If no, check that both ends of the DSX cable are properly seated and secured.
When OOF is on, match the Line Framing Format and Line Coding Format
options to the network provider's settings.
When ALM is on, contact the service provider.
Check Health and Status messages in the left column of the System and Test
Status screen to verify that there are no DSX-1 Health and Status messages.
Main Menu
If any DSX-1 messages appear, refer to the status information in Operation and
Maintenance of the User's Guide.
In the User's Guide, see Operation and Maintenance for additional status information,
and Troubleshooting for additional troubleshooting information.

Connecting to the DTE

1. Connect one end of the DTE's V.35 cable to the data port.
2. Plug the other end of the cable into the DTE.
3. Tighten the screws on each side of the connector to secure them.
P
O
R
T
1
If installing a FrameSaver 9128, repeat this procedure for the second port.
Verification Check:
Check that the port OK LED is on?
– If so, the port is ready to communicate.
– If not, check that both ends of the V.35 cable are properly seated and secured.
Then, check the DTE; RTS or DTR could be down on the DTE.
Status
System and Test Status
DSX
COM
POWER
P
O
R
T
2
MODEM NET
DBM
15
RJ48C
Jack
99-16632

Advertisement

Table of Contents
loading

This manual is also suitable for:

Framesaver slv 9128

Table of Contents