Verifying The End-To-End Path - Paradyne FrameSaver SLV 9126 Installation Instructions Manual

1-slot unit
Hide thumbs Also See for FrameSaver SLV 9126:
Table of Contents

Advertisement

Verifying the End-to-End Path

After installation of a remote site unit, run an IP Ping test to Ping the NMS at the central
site and verify that the entire path from the remote unit to the NMS is functioning. To run
the IP Ping test, NMS trap managers must have been configured for the remote unit.
One of those trap managers must be the central site NMS.
1. Select the IP Ping test.
Main Menu
2. Enter the IP Address of the device being Pinged, then select Start.
NOTE:
When running tests, the cursor is positioned over the Start command. Press
Enter to start the test. Stop is displayed while the test is running. Press Enter
again to issue the Stop command.
– While the test is running, In Progress... is displayed in the Status field.
– When the test is finished, Alive. Latency = nn ms should appear as the
Status ( nn being the amount of time the test took in milliseconds).
If any other message is displayed, additional testing will be required. See Device
Messages in Operation and Maintenance of the User's Guide for information
about IP Ping-related messages.
Connecting to the DSX
1. Connect the 8-positon modular plug end of the DSX cable to the DSX-1 interface.
If your DSX cable has a DB15 end, use a DSX-1 adapter cable.
Refer to the pin assignment information in the User's Guide to ensure you have
proper connections.
2. Connect the other end of the cable to the CPE (customer premises equipment,
like a PBX).
3. Tighten the screws on each side of the connector to secure them.
P
O
R
T
1
POWER
Test
IP Ping
P
O
R
T
2
MODEM NET
DSX
COM
DBM
14
PBX
99-16631

Advertisement

Table of Contents
loading

This manual is also suitable for:

Framesaver slv 9128

Table of Contents