Download Print this page

Inta IntaKlean Series Installation & Servicing Instructions Manual page 3

Advertisement

INSTALLATION
Ensure that the system is suitably drained down and all system pressure has been
released.
On open vented systems, make sure that the feed and expansion tank is either isolated
or "tied up".
When siting the IntaKlean ensure that the collection vessel is positioned to allow access
and removal of the bottom cover, withdrawl of the magnetic element and venting air.
Having removed the prescribed section of pipework, make sure that the open ends of
both pieces are free of debris and ready to receive the nut and olive. Fit both isolation
valves but do not tighten fully.
2
© Intatec Ltd 2012

Advertisement

loading
Need help?

Need help?

Do you have a question about the IntaKlean Series and is the answer not in the manual?

This manual is also suitable for:

Intaklean ikmf22Intaklean ikmf28