Keysight E4990A Installation Manual page 15

Impedance analyzer
Hide thumbs Also See for E4990A:
Table of Contents

Advertisement

Introduction
Environmental Requirements
Figure 1-3
E4990A with Option 1CN handle
The handle kit (Option 1CN) is used for transporting and relocating of the
E4990A.
The rack- mount kit (Option 1CM) includes two flanges (locking side plates) for
mounting the E4990A on a rack (482.6 mm/19 inches) conforming to the EIA
Standard.
Option 1CP comes with both, the handle kit and rack- mount kit.
While referring to
these steps.
Step 1. Remove the adhesive- backed trim strip (1) from each side of the outer frame
of the E4990A front panel.
Step 2. Use the provided screws to mount the
on each side of the E4990A front panel frame.
Step 3. (Option 1CN/Option 1CP). Attach the modified trim strip (3) provided to each
front handle in order to cover the front panel locking screws.
Option 1CN contains 2 pieces of standard and 1 special handles -
E4990-20001. Only one of the standard handle is required to be used to
mount on the analyzer. Standard handle is used for the left side and
special handle is used for the right side. Refer to
Keysight E4990A Impedance Analyzer
Figure 1-2
front handles (2) - for Option 1CN
rack- mounting flange (4) - for Option 1CM
both - for Option 1CP
install the handle kit/rack- mount kit by following
Figure
1-3.
15

Advertisement

Table of Contents
loading

Table of Contents